
Elbow with duck foot, SDR 11
Elbow with duck foot WF SDR 11
- Water
- Working pressure: PFA (water) 16 bar
- Material: PE 100
- Angle 90 degrees
- Assembly on the foundation possible
- Safety technology
- DVGW Registration No.: DV-8606AU2249
Note:
Ideal for the hydrant connection adjacent to main pipe. Extra spigot for connection to the house for continuous flow.
Areas of Application
The FRIALEN-Elbow with Base Unit WF 90° allows for connection of a hydrant alongside the mains.
The hydrant connection takes place either
- by fusing the HD-PE pointed end of the hydrant with the construction part or
- for a hydrant with flange connection by applying the FRIALEN-Full Faced Flange EFL* or with a Flange Reduction FLR** d 110/DN 80.
Connection to the HD-PE mains takes place without pressure via the FRIALEN-Spigot Saddle SA d 110/90-225/110 (see Data Sheet No. 27 and leaflet) or under operating pressure with an additional cut-off device. For drilling into the mains we recommend drilling equipment by Hütz + Baumgarten.
Assembly Instructions
Please refer to the FRIALEN “Assembly Instructions” for preparations for the FRIALEN-fusion process (two fusion procedures) of the elbow piece with HD-PE pipes or HD-PE pipe and HD-PE valve (marking insertion depth, removing oxide skin, cleaning, etc.).
* (see Data Sheet EFL No. 46)
** (see Data Sheet FLR No. 61)
Good reasons for using the FRIALEN-Elbow with base unit WF 90°:
- Great wall thickness ensures optimum stability and safe positioning of the hydrant
- Separate fusion zones enable simple tension-free fusion
- Floor plate can be mounted directly onto foundations
- Base unit and elbow make up a homogeneous unit
- Large coupler depth for ease of guidance of pipe and construction part
- Small annular gap for build-up optimum joining pressure in the fusion zone
- Extra wide fusion zones
- Cold zones at the front side and in the middle of the coupler
- Exposed heating coil for optimum heat transfer onto pipe/construction part
- Additional barcode for tracing back the underground fitting (Traceability-Coding)